Installation Products
GeoClip™
Anchor
Installation Reel
Grout pumps and reels

Design Support
GLD Software

How it works
Field Test Results
Savings
Installation procedures
Engineering specs

Savings using the GeoClip™

The following information presents the material and drilling cost breakdown for three types of geothermal installations:

  • Standard u-bend using standard 20% bentonite grout
  • Standard u-bend using thermally enhanced bentonite grout
  • GeoClip™ u-bend using a standard 20% bentonite grout

Vertical Heat Exchanger Material Costs

The table below shows the cost per linear foot of bore for each material that can be used in a vertical heat exchanger using a 3/4" u-bend pipe.

Material Cost Per Linear Foot of Bore

Material

Material Cost

4.5" Bore

5" Bore

6" Bore

3/4" U-bend Pipe
(Pre-manufactured)

$0.19 per ft

$0.38

$0.38

$0.38

Propylene Glycol  (20% Antifreeze Solution)

$10.00 per gal

$0.12

$0.12

$0.12

Bentonite Grout
(20% Solids)

$6.00 per 27 gal

$0.16

$0.21

$0.30

T.C. Enhanced Grout
(K=.85 btu/hr-ft-F)

$25.00 per 30 gal

$0.61

$0.78

$1.15

GeoClips™
(Spaced @ 10' Intervals)

$2.50 per clip

$0.25

$0.25

$0.25

 

The table below shows the combined material costs for a standard, thermally enhanced grout, and GeoClip™ installation per linear foot of bore.

 

Total material cost per linear foot of bore

Installation Type

Material Required

4.5" Bore

5" Bore

6" Bore

Standard

Pipe, Antifreeze, Bentonite Grout

$0.66

$0.71

$0.80

T.C. Enhanced Grout

Pipe, Antifreeze, T.C. Enhanced Grout

$1.11

$1.28

$1.65

GeoClip™

Pipe, Antifreeze, Bentonite Grout, GeoClips

$0.91

$0.96

$1.05

GeoClip™ & T.C. Grout Pipe, Antifreeze, T.C. Enhanced Grout, GeoClips

$1.36

$1.53

$1.90

 

Combined drilling and materials cost

The table below shows the total material and drilling cost per linear foot of bore.

 

Drilling costs per foot

Installation Type

Bore Dia.

$2

$3

$4

$5

$6

$7

$8

$9

Standard

4.5"

5"

6"

$2.66

$2.71

$2.80

$3.66

$3.71

$3.80

$4.66

$4.71

$4.80

$5.66

$5.71

$5.80

$6.66

$6.71

$6.80

$7.66

$7.71

$7.80

$8.66

$8.71

$8.80

$9.66

$9.71

$9.80

T.C. Enhanced Grout

4.5"

5"

6"

$3.11

$3.28

$3.65

$4.11

$4.28

$4.65

$5.11

$5.28

$5.65

$6.11

$6.28

$6.65

$7.11

$7.28

$7.65

$8.11

$8.28

$8.65

$9.11

$9.28

$9.65

$10.11

$10.28

$10.65

GeoClip™

4.5"

5"

6"

$2.91

$2.96

$3.05

$3.91

$3.96

$4.05

$4.91

$4.96

$5.05

$5.91

$5.96

$6.05

$6.91

$6.96

$7.05

$7.91

$7.96

$8.05

$8.91

$8.96

$9.05

$9.91

$9.96

$10.05

GeoClip™ & T.C. Grout

4.5"

5"

6"

$3.36

$3.53

$3.90

$4.36

$4.53

$4.90

$5.36

$5.53

$5.90

$6.36

$6.53

$6.90

$7.36

$7.53

$7.90

$8.36

$8.53

$8.90

$9.36

$9.53

$9.90

$10.36

$10.53

$10.90

 

Savings using the GeoClip™

Example: Cost of a single vertical heat exchanger bore

Situation: 3/4" u-bend, 20% glycol, 5" bore, $5 per ft. drilling cost

 

Installation Type

Bore Design Lengths (Ft)

Percent Reduced

Vertical Heat Exchanger Cost

Percent Savings

Standard 200 0.00% $1,142.00 0 %
T.C. Enhanced Grout 160 20.00% $1,004.40 12%
GeoClip™ 160 20.00% $953.60 16.5%
GeoClip™ & T.C. Enhanced Grout 140 30.00% $914.20 20%

 

GeoClip™ reduces vertical heat exchange bore cost by 24 percent!

As shown in the table above, using the GeoClip™ will reduce the required vertical heat exchanger lengths which can significantly lower your geothermal loopfield installation costs.

GBT, Inc.
6450 Pioneer Trail
Loretto, MN 55357
(800) 588-0608
(763) 432-4019
Fax: (763) 432-4021
geoclip@geoclip.com
 

 

About GBT   •  Products/Services   •  News   •  Contact Us
Links   •  Search   •  Site Map   •  Home